Past Projects
MD of Rockyview #44 Regional Collection Lift Station No. 3
| Client: | MD of Rockyview |
| Design Engineer: | Sim-flo Systems/Morrison Hershfield Ltd. |
| Location: | Chestermere Lake, Alberta |
| Total Project Cost: | 2.2 Million |
Project Description
Lift Station No. 3 is the third and the largest of the lift stations for the MD of Rockyview #44 Regional Collection System.
CDM responsiblities:
- Supply & install pumping equipment
- Fabricate & install all process piping
- Supply & install instrumentation
- Supply & install chemical feed system
- Supply & install domestic plumbing, heating & ventilation
- Supply & install miscellaneous metals
click picture to view more
click picture to view more
Scope of Work
As General Contractor on this project, CDM supplied sub-contractors for:
- Excavation and backfill
- Construction of concrete structures
- Erection of the 4 buildings
- Masonry
- Roofing
- Construction of access road & parking lot
- Electrical
- Controls & instrumentation
- Mechanical
- Process piping
- Plumbing
- HVAC
- Structural steel
- Misc metals
- Landscaping
- Construction of storm water drainage ditch
- Fencing
Cochrane Lakes Developments Water System
| Client: | Medallion Development Corp. |
| Design Engineer: | BSEI Inc. |
| Location: | Cochrane Lakes, Alberta |
| Total Project Cost: | 5.65 Million |
Project Description
The Cochrane Lakes Developments Water System included the construction of a Raw Water Pump Station, Sanitary and Storm Water Lift Stations, and the Water treatment Plant and Reservoir.
CDM responsiblities:
- Installation of owner supplied daft filter unit
- Fabricate & install all process piping
- Supply & install distribution pumping equipment
- Supply & install instrumentation
- Supply & install chemical feed system
- Supply & install all domestic plumbing, heating, & ventilation
- Supply & install miscellaneous metals
click picture to view more
click picture to view more
Scope of Work
As General Contractor on this project, CDM supplied sub-contractors for:
- Excavation and backfill
- Construction of concrete structures
- Masonry
- Roofing
- Construction of access road & parking lot
- Electrical
- Controls & instrumentation
- Mechanical
- Process piping
- Plumbing
- HVAC
- Structural steel
- Misc metals
- Landscaping
- Construction of storm water drainage ditch
- Fencing
Bow Island Water Treatment Plant Upgrade
| Client: | Town of Bow Island |
| Design Engineer: | MPE Engineering |
| Location: | Bow Island, Alberta |
| Total Project Cost: | 2.88 Million |
Project Description
The Bow Island Water Treatment Plant is a 3300 square foot facility. The WTP utilizes enhanced coagulation and membrane filtration and has a filtration capacity of 3.2 MLD. The reservoir storage capacity is 400m3.
CDM responsiblities:
- Installation of owner supplied daft filter unit
- Fabricate & install all process piping
- Supply & install distribution pumping equipment
- Supply & install instrumentation
- Supply & install chemical feed system
- Supply & install all domestic plumbing, heating, & ventilation
- Supply & install miscellaneous metals


Scope of Work
- Excavation and backfill
- Construction of all concrete structures
- Masonry
- Roofing
- Construction of access road & parking lot
- Electrical
- Controls & instrumentation
- Mechanical
- Process piping
- Pluming
- HVAC
- Structural steel
- Miscellaneous metals
- Landscaping
- Construction of storm water drainage ditch
- Fencing